Diesel generator Details | |
Model | JHK-75GF |
Power | 75KW |
Frequency | 50HZ |
Voltage | 380/220v(voltage can be customized) |
Optional Type | Open/trailer |
Size of Sillent type | 3000*1100*1750mm |
Weight of Silent type | 1800kg |
With Diesel Engine | |
Brand&model | Cummins 6BT5.9-G2 |
Prime Power | 86kw@50hz |
Standby Power | 92KW@50hz |
Cylinders | 6 in line arrangement |
Bore*Stroke | 102*120mm |
Displacement | 5.9L |
Fuel Consumption at 100% Load | 207g/kw.h |
Speed Governor | Electronic |
With Alternator | |
Optional Brands | Stamford/Leroy Somer/Mecc Alte/Marathon |
Exciter type | Single bearing,brushless,Self-excited |
Power factor | 0.8 |
Voltage adjust range | ≥5% |
Insulation Grade | H |
Protection Grade | IP23 |
With Controller | |
Optional brands | Deepsea/ComAp/Smartgen |
1.Q:What is your main products and applications?
A:Our main products are 4-cylinder/6-cylinder/12-cylinder diesel engine and diesel gensets.
Our engine is usually used on "Power generation equipment, Industrial water pumps, Agricultural machinery,
Marine and Ship, Engineering machinery, Vehicle & Special machinery",etc.
2.Q:How soon will I get my engine after payment?
A:Our warehouse has sufficient regular sizes stocking, ready to deliery, and we have lots of raw materials storage,
customer specifications can be arranged in a timely manner production, So the lead time within 7-10days for orders
under 100units/order, delivery time will be 20-60days depends on the arrival ports.
3.Q:When Can I get the price?
A:We will reply you within 24 hours after we get your inquiry, Or you could directly call us if you are urgent.
4.Q: What is your MOQ of this item?
A:1 Set
5.Q: Is it all right to make customer's own brand name?
A:We can be your OEM manufacture with your authorization of brand.
6.Q: Where is your Loading Port?
A:Xiamen or others
7.Q: What are your payment terms?
A:30% TT as deposit,70% TT before Shipment.
8.Q: What is your company's available production capacity?
A:100 Sets per month.
9.Q:What's the warranty time of diesel generators?
A:12 Months or 1000 working hours